$HOST Speed to power
The biggest problem in the AI space today is a shortage of power, and especially near-term power. The demand is real, the technology and chips are getting better each day, but there simply are not enough places to plug them in.
Most developers are focused on large, hyperscale developments, but are facing significant friction related to delayed or reduced power availability, interconnection queues, distribution upgrade cycles, long lead times on the equipment needed for large-scale deployments, zoning, permitting, and more.
HOST’s solution is simple: accelerate speed to market by minimizing friction. We are focused on acquiring and developing existing right-sized sites, which have power flowing to them today, and in the immediate-term, upgrading and retrofitting sites into modern AI/HPC facilities with efficient closed-loop liquid cooling and ICD 705-level security, where required