Italiabro
$BGDE energized footprint: 169 MW connected grid across four sites, with a near-term pathway to about 266 MW.
🔰 Midland, PA: 120 MW grid running.
🔰 Corning, OH: 24 MW grid running.
🔰 Bellefonte, PA: 8 MW grid running, with an additional 50 MW available for a total of up to 48 MW grid.
🔰 Texas Load House (Hood County, TX): 17 MW grid running, with a near-term path to 74 MW grid. Newest site, the DFW-area campus behind the Tensor IQ LOI. Longer-term, 1.5GW w/ Nat gas development.
4